MagnaDrive Coupling Air Preheater

air-preheater-2

Minnesota Power Upgrade to MagnaDrive Magnetic Couplings on Air Pre-Heaters.

1.0 Problem

Minnesota Power was experiencing vibration problems on their Air Pre-Heaters. In an effort to correct this problem, Minnesota Power implemented a preventative maintenance procedure that required all couplings to be re-greased during every outage.

Each re-greasing would tie up 3 Maintenance Technicians for 3 days. Worse yet, the reduction in vibration levels that was accomplished by the regreasing would only last a couple of weeks before the vibration would return.

2.0 Solution

MagnaDrive approached Minnesota Power with a proposal to replace the existing couplings with MagnaDrive Magnetic Couplings.

3.0 Result

Minnesota Power’s vibration problems on their Air Pre-Heaters have been completely eliminated. Estimated savings based on quarterly outages and 9 mandays per outage is: 4 outages X 9 man-days/outage X $600 /man-day = $21,600 annually!

air-preheater1
air-preheater2

Supporting Data:

Minnesota Power Cohassett, MN

Vertical Market: Power Generation

Application Type: Equipment/Machinery

Product: Magnetic Coupling, Total of 4 in use

Load Type: Air Preheater

Motor Characteristics: 40 hp 1800 rpm

MagnaDrive Advanatages:

  • Thermal Shaft Expansion
  • Vibration Isolation
  • Reduced Maintenance

Revolutionary
Power Transfer

Download the Magnadrive Handbook.

A world-changing industrial technology that saves energy, reduces operation & maintenance costs and improves system reliability.

Other Case Studies

Underground 30,000 Litre Fuel Tank Module

Water Cannon Repair

Breather and Sampling Point Audit - Nth Queensland

MagnaDrive saves Plant Feed Conveyor

MagnaDrive Coupling Vibration Success

Hose Down Pump

Bearing Skidding

Electric Motor Bearing Defects

Grease Contamination